Wednesday, 15 October 2014

Planning Pitch:Storyboard (By Lenya)



PITCH: Risk Assessment (by Stephane)

There a many things that we need to be careful of when Filming

- Making sure that we keep all equipment close by so they don't go missing
- If it does rain making sure we don't get the camera wet using umbrella's
- Filming in safe area's so as not to get robbed/mugged for equipment
- When finished filming putting all equipment away
- Take extra care with equipment in certain area's such as stairs
- Keeping liquids away from camera, for example: drinks

















Planning Pitch:Industry (By Traivon)


Planning pitch:Post production (by Lenya)

#

PITCH:Green Screen (by Lenya)


Powered by emaze

Planning Pitch: DigiPak (By Traivon)

This was the beginning of what i thought could be the basis of our digipak each single would have its own individual art work as well as having the main album art work which will feature a picture of the artist.The Album cover will either feature large bold black writing or it will have a dark black like background with white contrasting writing.





Planning Pitch:Synergy (by Traivon)

We have decided the one key visual element we are going use to link our digipak and our promotional video is the colour black, Sparkz will have black leather gloves which will be worn throughout the video and our visual package.We want the gloves to be the trademark prop which the artists is known for we want to make sure in the video it is quite dark and there are alot of shadows throughout.